Russian River Division Track Rehabilitation Picture

Russian River Division Track Rehabilitation

Client/Owner: North Coast Rail Authority
Project Start Date: February 2009
Project Completion Date: November 2009

Balfour Beatty Rail, Inc. was contracted to perform the rehabilitation of 62 track miles of wood tie track between two California cities: Windsor and Lombard. The project included 5,900 track feet of jointed track construction, replacement of 58,000 wood ties, and surfacing. Balfour Beatty Rail also furnished, installed, tamped and regulated 27,324 tons of ballast; restored 400 cubic yards of washout embankments; repaired culverts and reconstructed six timber headwalls. This operation included repairing, lubricating and adjusting 41 turnouts and 8,200 lineal feet of ditching. Balfour Beatty Rail, Inc. also ran a geometry car over the track to ensure the criteria and tolerances met the contract specifications.   

 



 
   © 2009-2010 Balfour Beatty Rail, Inc. All rights reserved.
Home  |   Safety  |   Sustainability  |   Site Map