New England Central/Vermont Railroad Highway Grade Crossings Signal ProjectNew England Central/Vermont Railroad Highway Grade Crossings Signal Project

Client/Owner: RailAmerica
Location: St Albans, VT
Project Start Date: May 2011
Projected Completion Date: August 2012
Actual Completion Date: October 2011

Balfour Beatty Rail, Inc. was contracted to remove all existing equipment and provide the design and installation for 20 crossings. Included in the scope was the installation of all new cable, gates with LED lighting, cantilevers, CWT train detection, along with pre-emption circuitry of traffic signals. These crossings were designed to enable passenger trains to service the new stations being constructed along the line. Balfour Beatty Rail worked with other contractors to complete the project well within the anticipated project completion date and, as a result, was awarded an additional 15 crossings.     
 



 
   © 2009-2010 Balfour Beatty Rail, Inc. All rights reserved.
Home  |   Safety  |   Sustainability  |   Site Map